0-9

2420 Bowditch

Building Details

Floors: 3

Year built: 1895

Accessible entrances: There is lift on the east side of the building that provides the sole access the building. The visitor needs to be buzzed in for the doors to be unlocked.

Restrooms: Nearest accessible restrooms are located at the Residential and Student Services Building located at 2610 Channing Way.

2108 Allston Way

Berkeley Wireless Research Center

Building Details

[under construction]

1925 Walnut St.

UCB Retirement Center, OLLI

Building Details

[under construction]

1608 4th St.

Campus Shared Services

Building Details

[under construction]

Dwight Way Child Development Center (2427 Dwight)

Building Details

Floors: 1

Year built: 1953

Accessible entrances: There is one accessible entrance located on the east side of the building.

Restrooms: No Public Restroom

Golden Bear Center (1995 University)

Built 1998. Extension, Parking and Transportation, Summer Sessions, Procurement Services, Bluecard, Institute of East Asian Studies, Center for Southeast Asian Studies

Building Details

[under construction]