Genetics & Plant Biology

Built 1990. One of four circa-1990 building projects aimed at revitalizing the biological sciences on the Berkeley campus, this building houses classrooms, laboratories, and office space.

Building Details

Floors: 3

Accessible entrances: The first floor has four separate buildings that contain classrooms. The doors to the classrooms are usable but do not automatic openers.

Restrooms: Usable restrooms are located on the first floor.

Designated waiting area: The Designated Waiting area is located to the left of the elevator when facing it. The DWA is located in the space between the exterior door and the emergency stairs.

Emergency evacuation cabinet: W: The emergency evacuation cabinet is located in the ground floor lobby next to the elevator.

Pictures of GPB

The south side of GPB. There is an outdoor courtyard in the middle of the building that has accessible entrances and an elevator

GPB

Location

Classrooms and Departments

Molecular & Cell Biology, Plant Biology, Pat Brown's Grill

Classrooms

100 GPB

Maximum Capacity

206

103 GPB

Maximum Capacity

45

104 GPB

Maximum Capacity

16

107 GPB

Maximum Capacity

45