Off Campus

Academic Achievement Program (2515 Channing)

Building Details

Floors: 2

Year built: 1920

Accessible entrances: In the rear of the building on the northside there is a ramp where the building can be accessed from.

Restrooms: The nearest accessible restroom is located at 2521 Channing Way.

2538A Channing Way

Building Details

Floors: 2

Year built: 1895

Accessible entrances: No accessible entrance.

Restrooms: No accessible restrooms.

2538 Channing Way

Building Details

Floors: 4

Year built: 1895

Accessible entrances: Rooms in the building are entered via a covered colonnade surrounding the parking area.

Restrooms: No accessible restroom.

2536A Channing Way

Building Details

Floors: 2

Year built: 1895

Accessible entrances: There is an exterior ramp leading to the Miller Institute main entrance.

Restrooms: No Accessible Restroom

2536 Channing Way

Building Details

Floors: 2

Year built: 1895

Accessible entrances: There is a wheelchair lift that serves the first level.

Restrooms: The single user restroom on the first floor provides grab bars, but inadequate dimensions for side transfer.

2420 Bowditch

Building Details

Floors: 3

Year built: 1895

Accessible entrances: There is lift on the east side of the building that provides the sole access the building. The visitor needs to be buzzed in for the doors to be unlocked.

Restrooms: Nearest accessible restrooms are located at the Residential and Student Services Building located at 2610 Channing Way.

2108 Allston Way

Berkeley Wireless Research Center

Building Details

[under construction]

1925 Walnut St.

UCB Retirement Center, OLLI

Building Details

[under construction]

1608 4th St.

Campus Shared Services

Building Details

[under construction]