Off Campus

2538A Channing Way

Building Details

Floors: 2

Year built: 1895

Accessible entrances: No accessible entrance.

Restrooms: No accessible restrooms.

2538 Channing Way

Building Details

Floors: 4

Year built: 1895

Accessible entrances: Rooms in the building are entered via a covered colonnade surrounding the parking area.

Restrooms: No accessible restroom.

2536A Channing Way

Building Details

Floors: 2

Year built: 1895

Accessible entrances: There is an exterior ramp leading to the Miller Institute main entrance.

Restrooms: No Accessible Restroom

2483 Hearst Ave.

Building Details

[under construction]

2536 Channing Way

Building Details

Floors: 2

Year built: 1895

Accessible entrances: There is a wheelchair lift that serves the first level.

Restrooms: The single user restroom on the first floor provides grab bars, but inadequate dimensions for side transfer.

2420 Bowditch

Building Details

Floors: 3

Year built: 1895

Accessible entrances: There is lift on the east side of the building that provides the sole access the building. The visitor needs to be buzzed in for the doors to be unlocked.

Restrooms: Nearest accessible restrooms are located at the Residential and Student Services Building located at 2610 Channing Way.

2240 Piedmont Ave.

Center for the Study of Law and Society, Legal Studies undergraduate major department, Jurisprudence and Social Policy PhD program

Building Details

[under construction]

2224 Piedmont Ave.

Built 1909. Center for Digital Archaeology

Building Details

[under construction]

2108 Allston Way

Berkeley Wireless Research Center

Building Details

[under construction]

1925 Walnut St.

UCB Retirement Center, OLLI

Building Details

[under construction]